List of projects completed and in progress in Kuwait

Foundation Pile Works:

Kazma Camp - National guard (2020)

Shortpiles for parking shed

RA245 - Mutlaa city road and bridges (2020-2021)

2000 foundation piles with dia 1200mm and 1500mm

400 KV OHL - MEW - NCC
(2020-2021)

Construction of foundation piles 600mm, 1000mm, 1400mm 

132 KV OHL - KOC
Larson & Toubro ltd. (2019-2021)

Construction of foundation piles 600mm, 1000mm, 1400mm 

Afcons RA256 (2018-2021)

Construction of piles Dia. 600mm for trough area

Afcons RA256 (2018-2021)

Construction of piles Dia. 900mm for bridge piers

Jawharat Al Khaleej (2018-2019)

Construction of piles Dia. 1200mm for high rise tower building 

New Maternity Hospital (2018-2021)

Construction of piles Dia. 1000mm for the new maternity hospital


RA264 – Al Ghouse Road (2017)

Construction of 700 piles for New RA264 Road development

Assima Tower-AlSalhiha Complex II-Tower Area Piling Works (2016-2017)

Construction of piles with Dia. 1500mm & 1800mm at 20 meters depth

KNPC-AlZour Refinery Project-Piling Works (2016-2017)

Construction of 3000 piles for the new refinery project at Al-Zour

New VW Showroom (2015-2016)

Shoring for 19m depth, combined by Berliner and Secant piles method along with dewatering and foundation piles

Assima Tower-AlSalhiha Complex II-Car Park Piling Works (2016)

Construction of over 450 tension piles with Dia. 800 mm at 16 meters depth

Sabah Al Salem Kuwait University 6A-6B (2013-2014)

Construction of 402 foundation piles having a diameter of 700mm and length 20m

N.B.K. Headquarters Bldg. (2012-2014)

Construction of 375 foundation piles having length 25m and diameter 1200-1500mm for the new NBK tower in Sharq

RA/213 West part of Abdul Nasser Str. (2014-2016)

Construction of foundation piles having a diameter 1,500mm.

RA/166 Jahra Road 80 (2010-2015)

Construction of 2,000 nos. foundation piles with permanent casing protection having a 25m length and 1200mm diameter.

Amiri Terminal Building (2007-2008)

Construction of foundation piles 0.7m diameter for the main building

MEW Over Head Power Line – 250kv (2012)

Foundation piles 600, 900, 1200mm for the Overhead Towers at Subhan

The Avenues – AlGhanim (2006)

Construction of foundation piles 1.0m diameter 18m depth

Al Hamra & Firdous Mixed Use Complex (2005-2006)

Construction of 290 foundation piles 1.2m diameter. Maximum length of piles 27.5

New Arraya Offices Tower in Kuwait (2005)

Construction of foundation piles 1.2m diameter 20m length

United Tower (2007-2008)

Construction of 190 foundation piles 1.2m diameter. Maximum length of piles 32m

Al-Sour Office Tower (2007-2008)

Construction of 92 foundation piles 0.8-1.0-1.2m diameter. Maximum length of piles 37m

Amiri Airport Aircraft Hangar (2008-2009)

Construction of 350 foundation piles 900mm diameter.

MEW Over Head Power Line – 400kv (2009-2011)

Foundation piles 1000mm, 1400mm, 1600mm for the Overhead Towers

Environmental Public Authority HQ (2010)

Construction of tension bell bottom piles 900mm diameter, 11m length for a raft foundation.

New Amiri Airport Terminal Hanger II(2013)

Construction of 460 foundation piles of 900mm diameter

Foundation Pile Works:

Al Hamra & Firdous Mixed Use Complex (2005-2006)

Construction of 290 foundation piles 1.2m diameter. Maximum length of piles 27.5

New Arraya Offices Tower in Kuwait (2005)

Construction of foundation piles 1.2m diameter 20m length

The Avenues – AlGhanim (2006)

Construction of foundation piles 1.0m diameter 18m depth

United Tower (2007-2008)

Construction of 190 foundation piles 1.2m diameter. Maximum length of piles 32m

Al-Sour Office Tower (2007-2008)

Construction of 92 foundation piles 0.8-1.0-1.2m diameter. Maximum length of piles 37m

Amiri Terminal Building (2007-2008)

Construction of foundation piles 0.7m diameter for the main building

Amiri Airport Aircraft Hangar (2008-2009)

Construction of 350 foundation piles 900mm diameter.

MEW Over Head Power Line – 400kv (2009-2011)

Foundation piles 1000mm, 1400mm, 1600mm for the Overhead Towers

Environmental Public Authority HQ (2010)

Construction of tension bell bottom piles 900mm diameter, 11m length for a raft foundation.

RA/166 Jahra Road 80 (2010-2015)

Construction of 2,000 nos. foundation piles with permanent casing protection having a 25m length and 1200mm diameter.

MEW Over Head Power Line – 250kv (2012)

Foundation piles 600, 900, 1200mm for the Overhead Towers at Subhan

N.B.K. Headquarters Bldg. (2012-2014)

Construction of 375 foundation piles having length 25m and diameter 1200-1500mm for the new NBK tower in Sharq

New Amiri Airport Terminal Hanger II(2013)

Construction of 460 foundation piles of 900mm diameter

Sabah Al Salem Kuwait University 6A-6B (2013-2014)

Construction of 402 foundation piles having a diameter of 700mm and length 20m

Assima Tower-AlSalhiha Complex II-Car Park Piling Works (2016)

Construction of over 450 tension piles with Dia. 800 mm at 16 meters depth

RA/213 West part of Abdul Nasser Str. (2014-2016)

Construction of foundation piles having a diameter 1,500mm.

New VW Showroom (2015-2016)

Shoring for 19m depth, combined by Berliner and Secant piles method along with dewatering and foundation piles

Assima Tower-AlSalhiha Complex II-Tower Area Piling Works (2016-2017)

Construction of piles with Dia. 1500mm & 1800mm at 20 meters depth

KNPC-AlZour Refinery Project-Piling Works (2016-2017)

Construction of 3000 piles for the new refinery project at Al-Zour

RA264 – Al Ghouse Road (2017)

Construction of 700 piles for New RA264 Road development

Foundation Pile Works:

Al Hamra & Firdous Mixed Use Complex (2005-2006)

Construction of 290 foundation piles 1.2m diameter. Maximum length of piles 27.5

New Arraya Offices Tower in Kuwait (2005)

Construction of foundation piles 1.2m diameter 20m length

The Avenues – AlGhanim (2006)

Construction of foundation piles 1.0m diameter 18m depth

United Tower (2007-2008)

Construction of 190 foundation piles 1.2m diameter. Maximum length of piles 32m

Al-Sour Office Tower (2007-2008)

Construction of 92 foundation piles 0.8-1.0-1.2m diameter. Maximum length of piles 37m

Amiri Terminal Building (2007-2008)

Construction of foundation piles 0.7m diameter for the main building

Amiri Airport Aircraft Hangar (2008-2009)

Construction of 350 foundation piles 900mm diameter.

MEW Over Head Power Line – 400kv (2009-2011)

Foundation piles 1000mm, 1400mm, 1600mm for the Overhead Towers

Environmental Public Authority HQ (2010)

Construction of tension bell bottom piles 900mm diameter, 11m length for a raft foundation.

RA/166 Jahra Road 80 (2010-2015)

Construction of 2,000 nos. foundation piles with permanent casing protection having a 25m length and 1200mm diameter.

MEW Over Head Power Line – 250kv (2012)

Foundation piles 600, 900, 1200mm for the Overhead Towers at Subhan

N.B.K. Headquarters Bldg. (2012-2014)

Construction of 375 foundation piles having length 25m and diameter 1200-1500mm for the new NBK tower in Sharq

New Amiri Airport Terminal Hanger II(2013)

Construction of 460 foundation piles of 900mm diameter

Sabah Al Salem Kuwait University 6A-6B (2013-2014)

Construction of 402 foundation piles having a diameter of 700mm and length 20m

Assima Tower-AlSalhiha Complex II-Car Park Piling Works (2016)

Construction of over 450 tension piles with Dia. 800 mm at 16 meters depth

RA/213 West part of Abdul Nasser Str. (2014-2016)

Construction of foundation piles having a diameter 1,500mm.

New VW Showroom (2015-2016)

Shoring for 19m depth, combined by Berliner and Secant piles method along with dewatering and foundation piles

Assima Tower-AlSalhiha Complex II-Tower Area Piling Works (2016-2017)

Construction of piles with Dia. 1500mm & 1800mm at 20 meters depth

KNPC-AlZour Refinery Project-Piling Works (2016-2017)

Construction of 3000 piles for the new refinery project at Al-Zour

RA264 – Al Ghouse Road (2017)

Construction of 700 piles for New RA264 Road development

Shoring and Dewatering Projects:

Kazma Camp - National guard

Supply and installation of shoring system for a range of depth at several locations
(2020-2021)

Jawharat Al Khaleej

Supply and installation of shoring system for a depth of 12m
(2020)

Kuwait University Tanks

Supply and installation of shoring system for a depth of 5m
(2018)

Al Hamra & Firdous Mixed Use Complex (2004-2005)

Construction of shoring system consisting of piles with pre-stressed anchors. Maximum depth of excavation 17.5 m

New Arraya Offices Tower in Kuwait (2005)

Construction of shoring system consisting of piles with pre-stressed anchors. Maximum depth of excavation 18.0 m

Al Asima project (2006)

Construction of shoring system consisting of piles and pre-stressed anchors.

United Tower (2007-2008)

Construction of shoring system with pre-stressed anchors

Injazzat Tower (2007-2008)

Construction of shoring system consisting of piles and pre-stressed anchors.

Amiri Terminal Car Park (2008)

Construction of shoring system consisting of piles and pre-stressed anchors.

Avenues Phase III (2008-2011)

Shoring, Dewatering and Excavation works. The shoring is consisting of twin tangent piles with pre-stressed anchors and shotcrete in between. Depth of excavation 21 m.

Al-Madina Office Tower (2008)

Construction of shoring system consisting tangent piles and anchors. Construction of foundation piles 1.2 m diameter and length 30 m.

Mina Abdula Refinery (2009)

Shoring works, consisting of piles and pre-stressed anchors

N.B.K Municipality Car Park (2011)

Construction of shoring system and deep wells. The shoring system is consisting of piles and pre-stressed anchors.

Al-Nafisi Hotel (2012-2013)

Shoring and dewatering works for excavation depth 16m

RA/167-Abdul Nasser Str.85 (2013-2016)

Shoring works for the trough of Abul Nasser street and 2nd ring road & Dewatering Works

New Al Kout Mall in Fahaheel (2014-2015)

Dewatering and Shoring works consisting from steel and secant piles along with anchors and wood lagging for an excavation depth of 19m.

Assima Tower-AlSalhiha Complex II-Shoring (2014-2016)

Shoring works for a depth of 18m

Kuwait International Tennis Complex (2015-2016)

Shoring works

Micro-tunneling Works:

Al Khiran - Pearl City Phase A1 Infrastructure Works (2004-2005)

Construction of 3,000 m of micro-tunneling with 400/600 mm and 1000 mm diameter.

Al Khiran - Pearl City Phase A1 Infrastructure Works (2005)

Construction of shafts of 4.5 m diameter 14 m excavation using secants piles.

Al Khiran - Pearl City Phase A1 Infrastructure Works (2005)

Construction of large diameter shaft 13 m diameter 18 m excavation for the construction of a Sewage Treatment Plant.

Egaila Pumping Station (2006-2008)

Construction of deep shafts 8 m internal diameter 40 m deep using secant piles and construction of 45m deep-wells.

Khiran Pearl City - Phase 2 (2006)

Construction of 86 shafts for micro-tunneling works using secant piles. Diameters used 700, 100, and 1100 mm.

Khiran Pearl City - Phase 2 (2007)

Construction of large diameter shaft 13 m diameter 22 m excavation for the construction of a Sewage Treatment Plant.

Khiran Pearl City - Phase 2 (2007)

Construction of a deep shaft 13m internal diameter 30 m deep using secant piles for the construction of pumping station.

Jaber Al- Ahmad City (2010-2012)

Construction of 12,000 meters micro-tunneling works of 400, 500, 600 and 800 mm diameter along with the required shafts and deep wells.

Al-Jaber Al-Ahmad Sea City (2011)

Construction of 2,000 meters micro-tunneling works, along with the required shafts and deep wells.

SE-95 - AL FIRDOUSE, ARDIYA (2012-2013)

Construction of 100 circular shafts of 3.5-4.5m diameter and depth12m, for the micro-tunneling works
apartment